![]() |
|---|
|
February 2005 - Refit |
||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Arrival at the Slipway
hauled out
after a waterblast
Chain Plates for the side stays in need of a polish
The sacrificial zinc anode after 7 months. Yes there is a tiny bit left just near the tip.
a nice clean bottom
Bobstay fitting and double zincs
The old butterfly hatch in need of some tlc
butterfly hatch removed
scraping all the old varnish off the butterfly hatch
New 10mm thick glass replaces the old cracked laminex
Wet sanding all the old layers of antifoul.
The crane arrives to remove the mast and motor
up goes the Perkins
Down goes the Perkins
The correct angle for removing a Perkins 4108
Engine Bay with 30yrs of oil & grime
The propellor shaft coupling
Tabernacle mast base
The mast before being overhauled & resprayed
The mast during overhaul & respray
sanding away the old blue colour
and now the nice magnolia colour
I love the new colour against the timber.
The front berth before
front berth now lined with teak and oak on the ceiling
masked off for new antifoul
new red antifoul applied
New anchor locker doors
this mess of wires is not as bad as it looks.
Bathroom before
and after. Just need to stain the timber.
re-launched and looking pretty.
|
|||||||||||||
|
|
|
||||||||||||